Mythri Metallizing primes and paints the steel that we blast, so that a single team is responsible for the entire project.

  • Primer to finish coat
  • Airless and compressed-air spray
  • DFT checked on every coat
A painting booth with orange frames and its doors open, with a large casting on a rail trolley inside

Durable Paint Begins with the Steel

A paint system is only as good as the surface beneath it and the thickness to which it is built. Because we blast the steel ourselves, primer is applied to clean, profiled steel within hours, before it can rust again.

Each coat is sprayed to its specified thickness and checked dry with a coating thickness gauge before the next is applied. Work at our facilities is carried out in spray booths, protected from dust and weather, and structures that cannot travel are painted on site.

Unit I handles blasting, metallizing and primer application, while Unit III handles painting operations: sanding, putty application, primer application and the final finishing coats.

We purchase primers and paints from certified industrial paint manufacturers, and apply the system specified by your consultant or paint supplier, or recommend one suited to the environment.

What We Paint

New Fabrications

Structures and equipment are blasted, primed and finished before they leave for site.

Machine-Tool Castings and Bases

Primed after blasting and stress relieving, ready for machining and final painting.

Paint over Metallizing

Paint over sealed zinc or aluminium provides colour and additional life in aggressive environments.

Maintenance Painting on Site

Blasting and repainting of plant structures during a shutdown.

Specification

Surface preparation
Blast to Sa 2½, or as the paint system requires
Coats
Primer, intermediate and finish coats
Paint systems
To your specification or the paint manufacturer data sheet
Equipment
Airless and compressed-air spray equipment with pressure pots (5 sets), paint agitators, spray booths
Where
In our booths at our facilities in Bengaluru, or at your site
Thickness check
Dry film thickness (DFT) on every coat with a calibrated gauge
Adhesion
Cross-hatch adhesion test on request
Conditions
Humidity and dew point checked before painting

Our Painting Procedure

Diagram in four stages: a steel frame is blasted, primed, built up with further coats, and inspected
Why It MattersEach coat has a job: the primer grips, the middle coats build a barrier, and the top coat resists weather and sunlight. Illustrative diagram.
  1. Blast

    The steel is blasted to the grade that the paint system requires.

  2. Prime

    Primer is applied on the same day, before the blasted steel can rust.

  3. Build the System

    Intermediate and finish coats follow within the recoat times given on the data sheet.

  4. Inspect and Record

    DFT is measured on every coat and recorded in the project report.

Applications

Industrial painting is one of our five core services, alongside blasting, primer application, stress relieving and metallizing.

Inside a lit painting booth: a large casting on a rail trolley over a grated floor, with paint drums at the side
  • Machine-tool castings and bases
  • Structural steel and trusses
  • Tanks and vessels
  • Bridge girders over metallizing
  • Plant equipment and pipe racks
  • Transformer tanks

Recent Projects

Prakash Asphaltings & Toll Highways, Ratlam

Aluminizing and 3 coats of paint · 2,600 m² of railway bridge girders · 2011

Steel girders of a railway bridge on State Highway 27, Madhya Pradesh, were metallized with aluminium and finished with a three-coat paint system.

Frequently Asked Questions

Can you apply a system specified by our paint supplier?
Yes. We follow the surface preparation, coat sequence, thicknesses and recoat times given on the paint data sheet or in your specification.
Is painting carried out on site?
Yes. Our teams take airless and compressed-air spray equipment to site and paint structures in place, usually immediately after blasting.
What is a duplex system?
A duplex system is paint applied over thermal spray zinc or aluminium. The metal coating protects the steel and the paint protects the metal coating, giving a longer life than either alone.
Are DFT reports provided?
Yes. Dry film thickness is measured on every coat and recorded in the project report.

Send a Drawing for a Painting Quote

Share the drawing, the paint system you specify and the quantity. One of our engineers will reply with the method and a quotation.

  • Reply within one working day
  • Drawings kept confidential
  • Email acknowledgement

Enquiry Details

Please enter your name.
Please enter a 10-digit mobile number or a landline number with STD code.
The email address appears incomplete. Please check for a missing @ symbol or domain.
Please select a service, or choose "Not sure, please advise".
Drawing or photographs

Thank you. Your enquiry has been received.

One of our engineers will contact you to discuss the requirement. A confirmation has been sent to your email address.